OVERHEAD LINES
11KV - 33KV
Contract : DEWA OHL 4222000025, RFX 2122000124 : Installation of 11 KV Overhead on Wooden Poles & Dismantling & recovery of existing 33KV/ 11KV overhead lines.
Client: Dubai Electricity & Water Authority (DEWA)
Main Contractor: EPS Electric Power Synergies LLC
Consultant: NOT APPLICABLE










Previous
Next
Brief Scope of Work:
- Site survey for Condition assessment, route markings and making of drawings.
- Installation, testing and commissioning of Wooden & Tower poles.
- Complete Testing & Commissioning of OHL up to 33 kV.
- Refurbishment and maintenance of existing overhead lines up to 33 kV.
- Removal & recovery of overhead line 33KV/11kV wooden pole foundations/steel structure along with complete accessories and return to DEWA scrap yard.
- Transport to site 11 KV overhead line with poles crossarms (Including earth wire components and other hardware) insulators, pre-cast concrete foundations and assemble the poles along with accessories.
- Making of OHL in mountain terrains as per specifications.
- Make temporary or permanent access for new line construction.
- Foundation design, construction and management
- Conductor tension stringing.
- Refurbishment and maintenance of existing overhead lines.
- Make temporary or permanent access for new line construction.