Contract
DEWA SS 4221900012, DEWA SS 4222000021, DEWA SS 4222000002 : Installation Testing & Commissioning of Distribution SS & Kiosk and Disconnection Recovery Re-placement of Equipment.
- Contract: Dubai Electricity & Water Authority (DEWA)
- Client: EPS Electric Power Synergies LLC
- Consultant: NOT APPLICABLE
Brief Scope of Work:
- Installation, testing and commissioning of 1000/500 kVA Pocket Substation (assembled unit of Transformer, LVDB and RMU) with/without LV Meter.
- Installation, testing and commissioning of 1500/1000 kVA Transformers.
- Installation, testing and commissioning of 8/12 Way Cubicle type LVAC Boards.
- Installation, testing and commissioning of 3/4 Function Ring Main Units (RMU).
- Complete Infrastructure works relating to installation of cables.
- Installation & testing of Cables – Low Voltage (LV) / High Voltage (HV).
- Recovery of Pocket Substations, Transformers (1500, 1000, 500 kVA) as per DEWA standards and specification.
- Jointing/Termination of 11kV 3C x 300/240 mm2 Cables.
- Complete Testing & Commissioning of Pockets/Sub-stations.
- Earthing Works – Internal & External for Pocket & Substations.